Repump Station Raw Water Line Valve Repair - Tampa Bay Water

Repump Station Raw Water Line Valve Repair

The Regional Repump Station moves up to 180 million gallons of water per day (mgd) to and from the C.W. Bill Young Regional Reservoir and the Alafia River to the Tampa Bay Regional Surface Water Treatment Plant.

Overview

This project replaces an existing valve with a new 36-inch control valve.

Benefits

Replacing this valve ensures raw surface water can be transferred to the surface water treatment plant.

Cost

Total cost for design and construction is $942,902.

Time Frame

This project is scheduled to be completed by October 2022.

Public Impacts

This project has no public impact as all work is contained within Tampa Bay Water property.